the Improvement of Shaleem Hill Road Ash Shuwaymiyah Road
916
Oman
Ministry of Transport & Communications
The project consists in the revision of the horizontal and vertical alignment of the escarpment section of the concerned road in order to improve safety. Four alternatives were investigated and evaluated in term of benefit/cost aspect, out of which the recommended solution was selected for implementation.
1) Topographic survey
2) Study of the proposed alternatives
3) Hydraulic study
4) Preparation of drawings
5) BOQ and cost estimate
6) Design report
Roads
Preliminary Design
Final Design-Design Review
5-Sep-09
On going