Asphalt Road to Kubut village at Marmul
1215
Oman
Best Infrastructure Developers LLC
Design and Construction of Asphalt Road to Kubut Village at Marmul (14 kms). The work includes 8.2 meter wide carriage way with 2.0 meters of hard shoulder on either side. The wadi portions shall be designed using Irish crossings (or Pipe culverts of 900 mm diameter) and protection slabs for existing PDO pipe line crossings.
1) Detailed Topographic Survey
2) Traffic Study
3) Perform a hydrology study and hydraulic design to determine the drainage structures
4) Prepare preliminary and detailed design
5) Coordination with concerned authorities to obtain their approval of the design
Roads
Preliminary Design
Final Design-Design Review
12-Jun-12
Completed