• Rehabilitation of Sohar/Wadi Hibi Road

     

  • Project Number:

    1207

     

  • Project Country:

     Oman

     

  • Client Name:

     Ministry of Transport & Communications

     

  • Narrative Description of the Project:

    Scope of the project is the upgrading of the section, about 40 km long, of the existing road that from Sohar leads to Yanqul. The road starts from the interchange of the planned Batinah Expressway and ends at Saih al Bareer village. The road runs through flat and rolling terrain and consists of a single two lane carriageway; it includes four bridges and several single to multicell drainage structures. Most of the road has been realigned because of the planned nearby Saih al Makaram Royal Camp. The total length of the road is about 33 km.

     

  • Description:

    1) Corridor Study
    2) Hydrological investigation and drainage structure hydraulic design.
    3) Bridge Design
    4) Alignment preliminary and final design
    5) Preparation of the tender documents
    6) Construction supervision

     

  • Project Sector:

    Roads & Bridge

     

  • Services:

    Preliminary Design
    Final Design-Design Review

    Supervision

     

  • Project Start Date:

    17-Mar-12

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status