• a New Permanent Outlet Structure for Tanuf, Sarooj, Muayden Dams

     

  • Project Number:

    1133

     

  • Project Country:

     Oman

     

  • Client Name:

     Ministry of Regional Municipalities & Water Resources

     

  • Narrative Description of the Project:

    The Ministry of Regional Municipalities and Water Resources required the execution of Leakage Prevention Measures at Wadi Al Muaydin dam, Construction of a new Intak Structure & Associated pipework at Tanuf Dam and A'Sarooj Recharge is part of recharge schemes of agriculture development in the Musandam Region.

     

  • Description:

    1) Setting up at borehole positions and rotary core drilling
    2) Water test and grouting with OPC and bentonite
    3) Prepare factual report
    4) Excavation for the foundations of the new intake structure, columns and valve boxes.
    5) Trench excavation for the new pipeline
    6) Construction of the access bridge and supports
    7) Construction of valve boxes
    8) Laying of new pipeline, connecting the pipework to the existing pipes and commissioning
    9) Installation and commissioning of the valves and actuators
    10) Installation of handrails to the access bridge
    11) Construction supervision

     

  • Project Sector:

    Dams

     

  • Services:

    Preliminary Design
    Final Design-Design Review

     

  • Project Start Date:

    1-Oct-11

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status