Project Location:
The project is located in Ansab area in Muscat Governorate.
According to the TOR, the Scope of Work is detailed as follows:
According to the Terms of Reference, the Scope of Work is divided into three stages as follows:
Stage 1 –Hydrological Review, Topographic Study, Soil Investigation, Hydraulic Modeling
- Inception stage including desk studies, review of existing information and initial site visits to determine additional information required
- Topographic surveys of each site, including the immediate upstream and downstream areas is required to ensure the hydraulic models are based on reality.
- Physical survey of all existing utilities, such as water supply and sewage networks, electricity and telecommunication cables, etc
- Hydrologic analysis of the upstream catchments to determine flood volumes and peak discharge is considered in detail.
- Hydraulic analysis of the water courses, including wadis and existing sub surface and surface drainage structures to locate areas where the conveyance capacities are exceeded
- Evaluation of various flood protection measures and overflowing risks
- Investigation Requirements including tender documents for geotechnical site investigations.
- Soil investigations
- Review of the hydraulic capacity of the existing drainage system
- Assessment of flood protection provided by existing flood conveyance and protection measures
Stage 2 –Preliminary Design of the project
- Definitions of Design Criteria and agreement on design parameters
- Proposals of Alternative solutions and analyzing both technically and financially
- Preliminary Design
- Structural details
- Cost estimate
- Construction programme
Stage 3 - Detailed Design and Tender Documents
- Detailed design
- Bill of Quantities
- Special Specifications
- Preparation of the Tender Documentation