• Detailed Design and Construction a Recharge Dams at Wadi Ghumdah in Wilayat Bukha of Musandam Governorate

     

  • Project Number:

    1213

     

  • Project Country:

     Oman

     

  • Client Name:

     Ministry of Regional Municipalities & Water Resources

     

  • Narrative Description of the Project:

    The dam is located near Goudah town in Wilayat Bukha-Musandam Governorate. The objective of the dam is to optimize the recharge of the local aquifer and to provide water to the downstream areas of Ghumdah town. The dam is upgraded to flood protection category during awarding process. The project may include 2 dams as per the latest information. The dams heights will be more than 12m with central spillway each.

     

  • Description:

    1) Project inception report
    2) Topographical survey report and maps of land allocation
    3) Field investigation report with analysis, interpretations and results
    4) Design criteria report
    5) Preliminary design report and cost estimate
    6) Environmental Impact Report
    7) Detailed design and cost estimate report
    8) Tender documents

     

  • Project Sector:

    Dams

     

  • Services:

    Preliminary Design
    Final Design-Design Review

    Supervision

     

  • Project Start Date:

    9-Jun-12

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status