• Ground Water Recharge Dam at Wadi SAHNA in Wilayat Madha - Musandam Governorate

     

  • Project Number:

    812

     

  • Project Country:

     Oman

     

  • Client Name:

     Ministry of Regional Muncipalities & Water Resources

     

  • Narrative Description of the Project:

    The area serviced by this dam is prone to extended draughts and the feasibility of the construction of a dam in this region had to be evaluated. The feasibility study as well as the Environmental scoping indicated that a dam in this area could only benefit the community. The final decision was to design and construct a zoned earth fill dam of approximately 500m long and just less than 10m high. The spillway is a broad crest weir with a stepped gabion chute slab on the downstream face of the dam. This will terminate in a gabion stilling basin prior to release of the flood water into the river. The outlet system is two simple pipe culverts with upstream control sluice gates. Limited instrumentation is allowed for in the project.

     

  • Description:

    1) Liaison with the Client and the local authorities and interested parties
    2) Detailed agri-economic evaluation of the area and proposed project
    3) Detailed geotechnical investigation
    4) Evaluation of the feasibility
    5) Preliminary design
    6) Detailed design
    7) Environmental Impact Assessment Study (EIA)
    8) Relocation of inhabitants and existing services
    9) Complete Tender documents
    10)Evaluation and recommendation of tenders
    11)Full spectrum of supervision services

     

  • Project Sector:

    Dams

     

  • Services:

    Feasibility Study

    Final Design-Design Review

    Supervision

     

  • Project Start Date:

    12-Jun-04

     

  • Project Status:

    Completed

     

  •  