• Design review and Supervision Services over the implementation of the project. Modernization of Hydropower Stations in Uzbekistan

     

  • Project Number:

    1415

     

  • Project Country:

     Uzbekistan

     

  • Client Name:

     State Joint Stock Company “Uzbekenergo”

     

  • Narrative Description of the Project:

    Objective of the project “Modernization of Hydro Power Stations (Farkhad HPS and Niznhe-Bozsu HPS-14)” is the revamping of two hydropower stations located in Uzbekistan. The Project is financed by Islamic Development Bank. Farkhad HPP is located along a derivative channel from River Sirdarya, starting from Farkhad Dam (Hmax=27.5 m), having an installed power of 127 MW and an annual long-term average energy production of 500 GWh. Niznhe-Bozsu HPP-14 is part of Nizhne-Bozsu HP cascade, which uses the difference of head along the homonymous irrigation channel for energy production. The installed power is 10.7 MW, with an average annual production of 45.0 GWh. The HPP was stopped in 2007 because of the failure of the hydraulic unit.

     

  • Description:

    Review and approve the detailed design of the project
    Prepare Tender Documents in accordance with IDB standards and procedures
    Assistance in the evaluation of bidders’ proposals
    Prepare evaluation reports for the Tender Commission
    Supervision of works during construction
    Training
    Project Management

     

  • Project Sector:

    Dams

     

  • Services:

    Final Design-Design Review
    Supervision

     

  • Project Start Date:

    23-Oct-14

     

  • Project Status:

    On going

     

  •  