• Bait Al Barakah -study of Wadi Flowing across east Boundary Wall at Safinat

     

  • Project Number:

    1330

     

  • Project Country:

     Oman

     

  • Client Name:

     Al Turki Enterprises

     

  • Narrative Description of the Project:

    Royal Court Affairs identified the need to conduct a structural review of the wall under construction and a hydrological analysis of the cathment upstream of the Safinat wall and provide protection to Sur Majid Village and consequently appointed Renardet SA & Partners through Al Turki Enterprises to do this work.

     

  • Description:

    1)Topographic survey
    2) Desk study of As Built drawings to determine the strength of the wall, current openings likely positions of deep scour
    3) Structural analysis
    4) Geotechnical Interpretation
    5) Hydrological analysis
    6) Hydraulic analysis
    7) Concept, Preliminary and Final Design of mitigating measures
    8) Tender documents

     

  • Project Sector:

    Drainage

     

  • Project Start Date:

    23-Oct-13

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status