• Track and Mountain Roads in Different Location in Different Governorate and Wilayat

     

  • Project Number:

    1222

     

  • Project Country:

     Oman

     

  • Client Name:

     Ministry of Transport & Communications

     

  • Narrative Description of the Project:

    The project comprised the study of (8) track roads existing within a total corridor length of 71 km. Upon subsequent design the length of track road was actually 140 km due to the numerous "hair-pin" bends required to achieved an acceptable vertical grade (up to 15%). The track roads are located in various locations within the Northern Hajar mountains, with the purpose to provide safer access to remote villages. The project had a budget that would only allow the minimum standards. The project was challenging in that numerous alignment iterations were carried out to achieve the optimum cut and fill.

     

  • Description:

    1) Renardet identified the project by site visits with the local leader of the village and a representative of the Ministry to define the start and end points for each track road
    2) A survey boundary was established and the survey sub-contractor commissioned to carry out aerial survey using a drone (UAV)
    3) Renardet created DTMs and base mapping for the study and design. Using highway design software "Prost" a process of evaluating different alignments in consultation with the Client was carried out. To achieve the final design output a balance between cost and acceptable standards was achieved
    4) The designs were finalised and tender documents comprising Prime Document, Specifications, Drawings and Bill of Quantities were completed

     

  • Project Sector:

    Roads

     

  • Services:

    Preliminary Design
    Final Design-Design Review

     

  • Project Start Date:

    28-Aug-12

     

  • Project Status:

    On going

     

  •  

Project Country
Project Sector
SERVICES
Project Status